You can configure how often and for how many years new
periods are generated.
Note: The period generation
horizon is the threshold for creating
the periods that are used by SLM touches. A batch job creates new
periods at the frequency specified by a user.
To set a new Period Generation Horizon:
-
In the Period Generation
Horizon area of the System page,
click the Edit button
.
The Edit Period Generation Horizon
dialog opens.
-
In the Timer Period (days) field, specify
how often you want to generate new periods.
-
In the Generation Horizon (years) field,
specify how many years to keep generating new periods.
-
Click OK.
The Edit Period Generation Horizon
dialog closes.
-
To run the batch job manually, click the Run batch job
now button
.
The application will automatically generate the different periods
from the current year to the end of the number of years
specified.Note: You can run the batch job manually by clicking the green
button at the top of this area.